Integrated Regional Water Supply Master Plan
Reservoir Expansion
Facility Expansion
Regional Integrated Loop System
• Phase 1A Interconnect (Kings Highway/Shell Creek)
• Phase 2 Interconnect (Peace River Facility/North Port)
• Phase 3A Interconnect (Carlton/Preymore)
Source Water Feasibility Study
• Flatford Swamp/Upper Myakka River
• Dona Bay/Cow Pen Slough
• Shell/Prairie Creek
Near Term Projects to Bolster Supplies
Peace River Manasota Regional Water Supply Authority 6311 Atrium Drive, Suite 100 Bradenton, FL 34202 941-316-1776 941-316-1772 fax email: peacemana@aol.com