
Integrated Regional
Water Supply Master Plan
Reservoir Expansion
Facility Expansion
Regional Integrated
Loop System
• Phase 1A Interconnect (Kings Highway/Shell Creek)
• Phase 3A Interconnect (Carlton/Preymore)
• Regional Integrated Loop System Feasibility/Routing Study
Source Water
Feasibility Study
• Flatford Swamp/Upper Myakka River
• Dona Bay/Cow Pen Slough
• Shell/Prairie Creek
Near Term Projects
to Bolster Supplies |